COORDINATE BEFORE DELIVERY
Pivot-door installation starts in the drawings
A large custom entrance affects the opening, supporting structure, finished floor, threshold, weather interface, access route and lifting plan. Dooream can discuss supplier-side information, while the project team confirms local structure, code, site preparation and installation.

THREE COORDINATION STAGES
SITE INFORMATION
Items the local team should resolve early
Exact requirements depend on the selected door and hardware system. This is a coordination checklist, not a universal installation instruction.
- Stable supporting structure around the opening
- Finished-floor level and threshold interface
- Exterior drainage, canopy or recess conditions
- Underfloor services and allowed fixing zones
- Wall and facade build-up around the frame
- Power or access-control interfaces when applicable
- Crate unloading, storage and route to the opening
- Qualified local installation and final adjustment team
Door configuration, project drawings received, supplier-side details, packing and export coordination to the agreed destination point.
Codes, permits, structural verification, waterproofing, site measurements, clearance, inland delivery, installation, interfaces and final acceptance.
USE THE APPROVED DRAWING
Final site work must follow the selected system and real project
Do not drill, construct or prepare the threshold from a generic web diagram. Confirm the exact configuration, hardware and approved shop drawing with the responsible supplier and local project professionals.
PREPARE THE ENQUIRY
Start with the dimensions and opening guide, use the architect drawing checklist, or discuss a custom pivot-door project.