SITE DIMENSION VERIFICATION
Separate Design Dimensions from Verified Site Conditions
A quotation drawing, structural opening and finished opening are different records. Before production release, the responsible site team should confirm what has actually been built, identify unfinished wall and floor layers, record the measuring date and show whether dimensions are minimum, maximum or nominal.

PROJECT DECISION POINTS
Opening status
Record: Structural, partially finished or fully finished
Explains which future layers may still change the available size.
Measurement set
Record: Width and height at multiple points, depth, diagonals and levels
Shows variation instead of hiding it behind one dimension.
Interface record
Record: Floor, wall, facade, head, threshold and nearby services
Connects the opening to the complete installation condition.
Verification owner
Record: Person, company, date, method and drawing marked up
Creates traceability before production release.
INFORMATION CHECKLIST
Site verification information to send
- Opening photos from inside and outside
- Width and height measured at several positions
- Opening depth, diagonals, plumb and level observations
- Finished-floor level and exterior-surface status
- Wall, facade, canopy and threshold information
- Marked drawing signed or confirmed by the responsible local party
USEFUL FIRST RESPONSE
The first review should compare the site record with the current project drawing and list any conflict that must be resolved. Dooream can review supplier-side implications, but cannot remotely certify a site measurement or local supporting structure.
RESPONSIBILITY BOUNDARY
Dooream discussion scope
Compare the received measurement record with the proposed door configuration and flag dimensional conflicts or missing information.
Local project responsibility
Take and verify site measurements, confirm finished interfaces and authorize the dimensions used for the project.
FREQUENT PROJECT QUESTIONS
Clarify the handoff before the next decision
Which entrance-door opening dimension should be used for production?
Use the dimension confirmed through the approved project drawing and the responsible local site-verification process, including unfinished interface allowances.
Can a supplier verify a project opening from one site photo?
No. Photos provide context, but the responsible local team should record and confirm dimensions, levels, interfaces and measurement status.
Continue the project research: pivot-door dimensions guide, shop drawing approval checklist, threshold and floor coordination, site preparation guide.
For architects, contractors, developers, importers and professional installers coordinating a confirmed premium entrance opening.