THRESHOLD INTERFACE PLANNING
Resolve the Floor and Water Interface Before the Entrance Arrives
The threshold is shared by the door system, interior floor, exterior surface, drainage and local waterproofing design. A flush visual concept does not remove the need to coordinate levels, clearances, water paths, pivot access and maintenance. The final detail must follow the selected system and the real project condition.

PROJECT DECISION POINTS
Floor relationship
Record: Interior finish, exterior finish and intended transition level
Shows the vertical space available for the proposed threshold.
Exposure condition
Record: Recess, canopy, facade direction and direct weather exposure
Gives the project team context for drainage and weather detailing.
Pivot access
Record: Bottom pivot location, adjustment access and removable-cover needs
Avoids burying service points beneath finished materials.
Responsibility line
Record: Supplier detail, waterproofing design, drainage and local installation
Prevents a generic web sketch from being treated as a site solution.
INFORMATION CHECKLIST
Threshold coordination package
- Door plan and section with pivot position
- Interior and exterior finished-floor levels
- Floor and facade material build-ups
- Canopy, recess and direct-exposure information
- Local drainage and waterproofing concept
- Required access for pivot adjustment or maintenance
USEFUL FIRST RESPONSE
A useful review should identify the proposed door-side interface and the information still required from the architect, waterproofing consultant, contractor and installer. Final drainage, waterproofing and local compliance remain project responsibilities.
RESPONSIBILITY BOUNDARY
Dooream discussion scope
Provide applicable door-side threshold and pivot-interface information for the proposed configuration.
Local project responsibility
Design and verify structure, drainage, waterproofing, finished levels, site preparation and installation.
FREQUENT PROJECT QUESTIONS
Clarify the handoff before the next decision
Can every pivot entrance use the same flush-threshold detail?
No. The selected door system, exposure, floor build-up, drainage, waterproofing and local requirements must be coordinated for the actual project.
Who is responsible for drainage and waterproofing around an imported entrance door?
The project team should name the responsible local architect, consultant, contractor and installer. Supplier-side information does not replace the local site design.